Basic Info.
Pervious Concrete Composition
Stone, Cement, Water, Permeable Concrete Reinforce
Color of Permeable Concrete
Various Color Selection
Characteristics of Permeable Concrete
High Permeability
Applied Range
Sidewalks and Bike Paths Ground Decoration in The
Nature of Business
Manufacturer; Manufacture Factory
Product Description
Product Introduction
Permeable concrete is a new type of road pavement material, it is a comprehensive innovation to the traditional concrete road pavement, it by adding green, environmentally friendly inorganic reinforcer agent (water, powder), and cement, water, paint in a certain mixing ratio, made from porous lightweight concrete material, pavement can meet all kinds of load roads, parking lots, walkways and other facilities. It has the characteristics of high strength, strong permeability and good wear resistance.
High permeability | 31-52 l/m/h |
High bearing capacity | C20-C35 |
High heat dissipation | 15-25% |
High folding resistance increases interlayer bond strength. The strength of permeable pavement can reach C20-C35.
Bill Of Materials
Local procurement
Stones (clean, high strength, uniform particle size); Cement (425# Portland cement); Water (clean water).
Yan stone provide
Permeable concrete reinforcement. Pigment for pervious concrete. Protective agent for permeable concrete surface
Advantage Of Permeable Road
High permeability, beautify decorative effect.
Frost - thawing resistance, high heat dissipation.
Easy maintenance, high bearing capacity.
Noise and dust reduction, easy construction, short time limi
Permeable Pavement Scenario Application
Community Pavement Application Park Road Application Square Application Application In Traffic School Application
Application Non-slip, wear - resistant. Ventilation and permeation. Noise reduction and Field Safety, anti-skid.
No water, comfort. Crack and fracture
easy to melt snow. resistance.
YS ecological slope protection system
(River Revetment Applic
Permeable Concrete Construction Tool
Staffing requirements Professional certification of test report
A group is generally equipped with 12-15 people, not less than 12 people. Multiple quality tests - strength beyond doubt.
Enterprise Strength
Every construction we carefully guide. A large number of spot goods, fast delivery, not to miss the deadline. Annual output of ten thousand tons of shipments, let you no longer wait!
Engineering Effect Real Shooting
Description of permeable concrete reinforcing agent
Permeable concrete reinforcing agent is a kind of grey powder additive, the reinforcing agent produced by our company has added a variety of effective ingredients such as: infilling silica powder, resin rubber powder, nano-polymer reinforcing agent, high-efficiency alkali water agent, anti-alkali agent, anti-crack element, high-standard cement, aggregate and other components.
The amount of glue can reach 40-60%
Permeable concrete reinforcement agent can participate in the hydration reaction of cement to form polymer cement hydration body, so as to ensure that concrete without the participation of sand can guarantee a certain compressive strength, to meet the use requirements of towns, parking permits, community landscape and other roads with light load of less than 40K axle load.
What is the core function of pervious concrete reinforcement in pervious floor pavement?
1. Enhance workability and viscosity of concrete
2. Increase the surface activity of cement and transform the dispersion of cement base
3. Maintain the stability of the aggregate surface covered by concrete slurry
4. Greatly improve the compressive strength and bonding strength of cement hydration body
5. Improve the freeze-thaw resistance, durability and weatherability of concrete
The reinforcing agent that permeable concrete admixture USES also calls permeable concrete reinforcing agent, action is to raise the early strength of permeable concrete.Solve the concrete, cement, road, wear-resistant floor ground sand up ash situation.Its core function is to enhance workability and viscosity of pervious concrete and surface activity of cement.Without changing the basic performance of cement, the stability of permeable concrete slurry wrapped in aggregate surface stone is maintained, and it can be attached to aggregate surface stone equably.Enhance the cement bond rate, ensure the strength of permeable concrete, meet the need of permeable rate.
In fact, there are two kinds of pervious concrete reinforcement, pervious concrete strengthening agent and pervious concrete cement, it is an indispensable admixture in the production of pervious concrete.The main function of permeable concrete reinforcement is to make the stone fully wrapped by the cement slurry, keep the slurry still, improve the bond of permeable concrete, and lay a good foundation for the improvement of the strength of permeable concrete.
Good standard permeable concrete reinforcement agent can play a great role in permeable concrete, such as not to drop stones, road surface empty drum will not appear to fracture, road permeable, not to appear alkali phenomenon and so on.
Application manual for guiding construction of permeable concrete
I. concept of permeable concrete
Permeable concrete is a kind of porous concrete, also known as porous concrete, sand - free concrete, permeable floor.
It is a kind of porous lightweight concrete made of aggregate, cement, reinforcing agent and water. It contains no fine aggregate.
Commonly used pervious concrete according to the composition of the material, there are cement pervious concrete, asphalt pervious concrete.According to the appearance of pervious concrete is divided into ordinary pervious concrete, color pervious concrete and exposed material pervious concrete.
Ii. Preparation and conditions
2.1 on-site preparation
Preparatory work before pervious concrete construction: refers to the pervious concrete construction before the completion of each process, has passed
Acceptance, in accordance with the pervious concrete construction preparatory work.
1. The construction site has reached "three connections and one leveling", that is, water connection, electric connection, road connection and construction site leveling.The construction site conforms to the conditions of stacking raw materials, the equipment installation has been completed, and the construction machinery enters the site to meet the construction requirements.
2. The construction of cushion layer and sand filter layer has reached the design elevation, the compaction of cushion layer has been finished, and the leveling and compaction degree meet the design requirements.(the construction surface is ready and meets the construction conditions)
3. When the construction personnel and materials enter the site, they pass the inspection and meet the construction conditions.
2.2 construction conditions
1. The site of the mixing yard should be close to the paving site and should not exceed 30 minutes from the date of discharge to the completion of the paving. The summer construction should not exceed 20 minutes.
2. It is recommended that one group be assigned as follows: two people put in cement and reinforcing agent, one person drives a forklift to load materials, one person transports materials by a bucket truck, two people on the spot scrape the board initially and wipe the edges and corners, one person is responsible for the cement flattening machine and one person is responsible for repairing holes and covering plastic film.In total: eight.
3. Avoid construction in dry weather with temperature below zero or above 40 ºC.
4. There should be measuring tools for on-site feeding.The amount of stones and cement should be strictly controlled in proportion. The cementing material (reinforcing agent) should be put into good measuring tools to ensure the same amount of cement each time.The water discharge shall be timed by a time relay or recorded with water on the barrel to ensure the stability of each discharge.
2.2 tools and machinery
According to the quantity of the project, the configuration of the entry machinery is determined. The general configuration is as follows:
1. Forced 500 concrete mixer 2. Loading forklift
3. Transporter 4. Low-frequency plate vibrator
5. Concrete finishing machin 6. Cement trowel (several)
7. Seam cutting machine (or telescopic seam separator) 8. Airless spraying machine
9, water pump, high-pressure water gun 10, electronic scale
11. Cover the curing film 12. Long horizontal scraper
Note: if the site is not paved with kerb stones, the formwork should be set up in advance
3. Proportion of permeable concrete (1 cubic meter)
The intensity of | The stone | cement | Strengthening agent | water |
C20 | 1650 kg | 358 cement quantity | 10 kg | 130 kg |
C25 | 1650 kg | 378 cement quantity | 12 kilograms | 137 kg |
C30 | 1650 kg | 398 cement quantity | 15 kg | 145 kg |
Note: the above data is for reference only. During site construction, the water-cement ratio should be adjusted in strict accordance with the requirements of site technicians according to the actual situation (such as the degree of stone cleanliness, etc.).
construction technologyConcrete mixing
1, play the design line.
2, on the basis of plain soil paving should be compacted, and then wet the ground, the cement foundation should wet the cement ground, or sweep cement mud, strictly prohibited when the ground is dry paving.
3. Mixing and feeding of permeable concrete must be carried out in strict accordance with the requirements of mixing ratio or on-site technical personnel, and no wrong casting is allowed.The first feeding must be weighed, and a reference mark can be made in the feeding machinery container.
4. Feeding sequence: firstly, add aggregate, cement and pervious concrete reinforcement into the mixer to mix dry for 15s, add 50% water to mix for 50s, and then add the remaining water to mix for 100s.The amount of water in different sites is different, the first mixing should find the right amount of water, after each mixing as the basis for the deployment of materials, the appropriate state for the slurry is not out of the slurry: the cement slurry is wrapped on the stones, and the cement slurry is not bleeding, not flow slurry.Without cement slurry, the water is too little, paving after easy to drop particles, should add water, flow slurry is not permeable after paving, should be abandoned or paved on the cushion.
5. Stirring time
From feeding and mixing to discharging, 350 type drum mixer normally takes 3.5 minutes.The model 500 forced mixer takes 3 minutes.
4.3 transportation of finished materials
1. The mixed finished products shall be transported to the construction site in time after discharging, and shall be transported to the site for construction within 30 minutes, and shall not exceed 20 minutes in summer.
2, pavement site, first with manual scraping board preliminary scraping, and then with cement wipe machine back and forth wipe flat, wipe flat after still have potholes, the application of mixed materials to fill the place, edge and corner machine wipe less than the place, must use manual trowel wipe flat, otherwise the strength is not good, easy to drop particles.
The construction sequence
The basic construction sequence is: paving → leave joint → tamping
The construction sequence of the surface is: paving → leveling → finishing → retraction → curing → cutting → caulking
The order of construction of protective layer is: deployment of protective agent of surface layer → spraying
The construction interval between the base and the surface is: it is suggested to lay the base in the morning and lay the surface in the afternoon.This method can effectively ensure the strength of permeable concrete, shorten the construction period and reduce the cost.
4.5 paving
Use shovel, rake for paving, permeable concrete mixture should be spread evenly.
A: when paving the permeable concrete base course, the position of expansion joint should be determined in priority, the size should be specified, the mark should be made, and the joint should be retained according to the requirements (when the paving area of the base course is recommended to reach 25m2, the joint should be retained). The paving height should be 1cm to 1.5cm higher than the elevation to ensure that the low-frequency flat ramming is used to meet the design height.
Note: indwelling expansion joint is separated by expansion strip;It can avoid the road surface "heat expansion and cold contraction" formed by empty drum, cracking phenomenon;
B: when paving the permeable concrete surface layer, it is necessary to calculate the height in the early stage. Just like the base layer, the reasonable control of the height can make the compacted surface layer conform to the design height and meet the design requirements of the road surface layer.
After spreading evenly, use a scraper to make the surface even and then use a polishing machine to polish the surface compaction, in order to ensure the tightness of the permeable concrete pavement, so as to ensure the strength of the concrete (when the weather is hot polishing must be timely, otherwise the stones will be killed by the sun, so as to produce the phenomenon of dropping stones), leave two people on the edge of the edge, patch.
maintenance
The maintenance of permeable concrete after pouring and forming is the key to ensure the quality of permeable concrete.
Immediately after the completion of the engineering with mulch, sprinkler maintenance, routine concrete curing period for 28 days, we suggest that the maintenance of more than two weeks, the curing period, every day should be 2 ~ 4 times sprinkling water on the cover good film, film paste evenly cover on the surface rocks, curing film with a large number of dew is the best state of floating on the surface layer stones.
The damage of the film should be avoided as far as possible within 3 days before the curing period. The damage of the film will directly lead to improper curing and maintenance leakage, thus resulting in sub-drop phenomenon.
Cut and fill seams
When the strength of permeable concrete reaches about 70% (2 weeks in winter, 5-7 days in spring and autumn, and 2-3 days in summer), a seam cutting machine is used to cut joints.When cutting the expansion joints at the base level, the joints should be consistent with the upper and lower joints of the surface layer and should not be staggered to ensure that the expansion joints of permeable concrete are connected up and down.After cutting the joint, the stone powder in the joint must be washed with water in time to ensure that there is no dust in the joint, and the concrete surface mud caused by cutting the joint should be washed clean.The setting of single block expansion joint area first meets the design requirements, and then it must be 25 m2~30 m2 according to the specification, not more than 30 m2, the best is to control within 25 m2, the area will lead to cracks in the concrete surface layer, or even the phenomenon of empty bulge.
With to expansion joint and the extruded board populated, contraction joint article filled bubble inside, at the time of caulking contraction joint reserved 2 ~ 3 mm height, and then inject glue sealing structure, the embedded seam width, surface flat, feel is good, so request sealing material must stick relay is strong, good resilience, to adapt the expansion and contraction of concrete, and insoluble in water, no water seepage, ageing resistance, resistance to high temperature and low temperature freeze resistance is good.
Note: due to uncontrollable factors such as the weather, if the stones fly out when cutting the seam, it means that the strength is not enough and it needs to be cured for several days.
Spray coating protectant
Spraying time: it is recommended to maintain the coating for 7 days before spraying the protective agent, that is, after the completion of cutting and caulking.If the project progress is very urgent, it is still necessary to ensure that the coating protection agent is sprayed after 3 days of maintenance.
Matters needing attention
1. During the construction and maintenance of permeable concrete pavement, attention must be paid to the protection of finished products. Walking, animal walking and vehicle driving should be strictly prohibited on the pavement.Due to repair difficulties, the surface is not easy to bond to the original level, so the product protection has been to adhere to the completion of acceptance delivery can be ended.
2. If the semi-permeable structure is used to lay the permeable concrete, clean the shang mixture first, then mix it with 42.5 cement and water, and evenly pour it over the shang mixture.